Time contraints? Not going to get it done? Com'on Andrew, the above list looks like a lazy afternoon to meAndrewT wrote:Thanks...
I'm definitely not going to get it done on time. I have exactly 1 week left. With a fulltime job and Tuesday and Wednesday nights both writeoff's this week due to other commitments....it aint happening.
Still needs;
- put engine in
- put all engine accessories into engine bay
- fit VL turbo fuel pump and plumb it all up
- get the turbo dump adapted to the rest of the exhaust by an exhaust shop
- put clutch back on engine (I'll take a chance due to time constraints and use the clutch that came with the frontcut, it looks to be in good nick).
- put gearbox in (customize crossmember)
- Cut down wiring loom! (not started yet)
- Fit wiring loom
- fill up all oils etc
- Fit radiator and fans and fill up with coolant
- get a good set of 13" tyres onto the mags
- fit the front hubs, struts, brakes etc (still need to buy brake pads for these)
- get a front wheel alignment done
- do a few test drives to make sure it's all good (in the dark backstreets!)
- give the entire body a very aggressive cut/polish (the paint is very marginal)
- get it police inspected and licensed!!
Bennie